Energy use by all facilities and equipment at these establishments is included, whether or not it is directly associated with growing crops and/or raising animals. The arrangement from the viewpoint of the second party is termed a "farm-in arrangement."įarm use: Energy use at establishments where the primary activity is growing crops and/or raising animals. The first party retains an overriding royalty or other type of economic interest in the mineral production. Types of abnormal conditions that should be reported include the imposition of a special operating procedure, the extended purchase of emergency power, other bulk power system actions that may be caused by a natural disaster, a major equipment failure that would impact the bulk power supply, and an environmental and/or regulatory action requiring equipment outages.įarm out (in) arrangement: An arrangement, used primarily in the oil and gas industry, in which the owner or lessee of mineral rights (the first party) assigns a working interest to an operator (the second party), the consideration for which is specified exploration and/or development activities.
For a cogenerator, the facility includes the industrial or commercial process.įahrenheit: A temperature scale on which the boiling point of water is at 212 degrees above zero on the scale and the freezing point is at 32 degrees above zero at standard atmospheric pressure.įailure or hazard: Any electric power supply equipment or facility failure or other event that, in the judgment of the reporting entity, constitutes a hazard to maintaining the continuity of the bulk electric power supply system such that a load reduction action may become necessary and reportable outage may occur.
A facility may contain more than one generator of either the same or different prime mover type. The charge may include operation and maintenance as well as fixed costs.įacility: An existing or planned location or site at which prime movers, electric generators, and/or equipment for converting mechanical, chemical, and/or nuclear energy into electric energy are situated or will be situated. This is the value of coal at the coal mine or of coke and breeze at the coke plant without any insurance or freight transportation charges added.įabricated fuel: Fuel assemblies composed of an array of fuel rods loaded with pellets of enriched uranium dioxide.įacilities charge: An amount to be paid by the customer in a lump sum, or periodically as reimbursement for facilities furnished. The reported price should be after deducting any rebates and discounts or adding premiums where applicable and should be the actual price paid with no adjustment for credit terms.į.o.b. price: The price actually charged at the producing country's port of loading.
The value of a commodity at the port of exportation, generally including the purchase price plus all charges incurred in placing the commodity alongside the carrier at the port of exportation in the country of exportation.į.o.b.